Slurry Seal Project – July 16th – 19th

Posted By on July 1, 2019

The Nevis Milano Board of Directors has contracted with Quickel Paving to seal coat the community streets. The project was originally scheduled in May, but was rescheduled due to notification from Cox that they would be doing equipment upgrades in the area which would require removal and replacement of some areas of asphalt and concrete. While the work is in progress in one section, you are required to park in another section of the community. The slurry seal schedule is below (weather permitting), and the slurry seal map is attached for your review.

TUESDAY, JULY 16th – PINK SECTION

THURSDAY, JULY 18th – BLUE SECTION

When the seal coat material is applied, it will take a minimum of twenty-four (24) hours to dry, weather permitting. While the seal coat is drying, it will be sticky and easily tracked if walked on or driven upon. Therefore, to protect residents and guests, the streets highlighted on the map will be barricaded beginning at 7:00 AM on their respective service date. Vehicles will be permitted back on the street the following day by 5:00 PM provided the weather allows for adequate curing of the seal coat material. Please note that the start times are subject to change. You are required to relocate your vehicle before 7:00 AM on the service date. Any vehicle found parked on the asphalt during the scheduled date and time will be towed with no prior notice at the vehicles owners’ expense.

To ensure you will have use of your vehicle, residents are encouraged to find appropriate parking accommodations the evening before the seal coat work begins. The Marian Bergeson Elementary school located across the street has graciously allowed Nevis Milano residents to use their parking lot to park their vehicles overnight on the evenings of Tuesday, July 16th, and Thursday, July 18th. The vehicles must be removed from the parking lot by 7:00 AM the following morning.

Please be aware that any resident damaging the seal coat by driving or walking on it while the barricades are in place will be responsible for the costs of all damages and re-work. Thank you for your cooperation. We understand this work creates an inconvenience for everyone; however, it is necessary to protect your investment in the community. Should you have any questions, please contact:

Quickel Paving (949) 582-1515

Action Property Management (949) 450-0202